Precision Pre-fabrication That Elevates Every Project

Inside our 100,000-square-foot facility, we engineer, fabricate, and test complex plumbing and HVAC systems.

Crafted by Specialists Combining Hands-On Expertise with Advanced Coordination

JCM’s state-of-the-art 100,000-square-foot Pre-fabrication Facility in Upper Marlboro, MD is at the core of our ability to deliver speed, quality, and consistency on every job. Strategically designed from the ground up, our new shop layout maximizes productivity, safety, and efficiency, allowing our team to fabricate complex mechanical and plumbing assemblies with unmatched precision.

Within this controlled environment, our craftsmen fabricate, tag, and test piping systems and components that arrive on site ready for seamless installation. By coordinating closely with our BIM and VDC teams, each pre-fabricated assembly is modeled, detailed, and produced to exact field conditions.

Our Pre-fabrication Capabilities Include

  • Steel sleeves
  • Hangers
  • Custom pipe supports
  • Pump and chiller headers & drops
  • Heat exchanger connections
  • Cooling tower piping
  • Large bore plumbing risers
  • Plumbing & HVAC mains
  • Terminal unit valve assemblies
  • Gang bathroom in-wall waste assemblies
  • Makeup water stations
  • Physical mockups

Pre-fabrication isn’t just a process at JCM, it’s a philosophy

By aligning our fabrication capabilities with the project’s construction phases, we are able to deliver high quality work at a greater efficiency, on a tighter schedule, with superior results.

  • Faster, more accurate installation
  • Consistent quality control through testing and inspection before delivery
  • Safer, cleaner, and more predictable job sites
  • Reduced on-site labor, waste, and rework